PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Duct hangers at the 2nd floor Facing North-East  (800x600).jpg Electrical conduit at the Electrical Room 284 Facing North (800x600).jpg Installed temporary lighting at the 3rd floor. Facing South-East (800x600).jpg Installing gas piping at the 1st floor Facing North (800x600).jpg Installing gas piping at the 1st floor Facing South-West (800x600).jpg Layout for the interior framing at the 3rd floor.(800x600).jpg Overhead conduit at the 1st floor going into the Electrical Room 284 Facing South (800x600).jpg Split wire at the 2nd floor Facing East (800x600).jpg Started building scaffold at Stair -4 Facing East (800x600).jpg
Previous pageNext page Installing gas piping at the 1st floor Facing South-West (800x600)
Installing gas piping at the 1st floor Facing South-West (800x600)